Project collaboration

Microcement for interior projects. Decisions before installation.

VPD installs microcement surfaces. With architects and interior designers, we clarify the information needed for installation: substrate, divisions, edges, junctions, texture and work sequence. We do not design complete interiors or replace the project author.

VPD team members discussing surface installation details on site
On-site coordination · VPD project
01Substrate02Detail03Installation

When to contact us

When should VPD join the conversation?

Ideally once the interior direction is defined, but before decisions that affect installation are finalised.

01

Before choosing the solution

We review the application, conditions of use and available substrate information.

02

Before closing the details

We agree edges, corners, drains, junctions and transitions to adjacent materials.

03

Before pricing the work

We structure the scope, responsibilities and information required for an individual quotation.

Coordination scope

What do we agree for installation?

We focus on decisions that affect delivery and the later use of the surface.

01

Substrate and preparation

Condition, stability, available build-up information and the preparation scope.

02

Wet areas and drains

Zone layout, falls, drains and available waterproofing information.

03

Edges and junctions

Corners, terminations, skirtings and junctions with wood, tile, glass or metal.

04

Surface divisions

Visible lines, movement joints and places where continuity must be interrupted.

05

Colour and finish

Direction for colour, texture and protection in relation to light and use.

06

Work sequence

When VPD enters the site and how our scope depends on other trades.

Tool working along the edge of a microcement surface
Installation detail · real VPD work

From design to site

We turn project materials into a clear installation scope.

  1. 01

    You send the material

    Plans, visualisations, site photographs and information about the intended use.

  2. 02

    We check what is missing

    We identify gaps and the locations that need further clarification.

  3. 03

    We agree scope and price

    We describe the assumptions, responsibilities and prepare an individual quotation.

  4. 04

    We install and hand over

    We deliver the agreed scope, control the details and provide information for use and care.

A short brief

Five details help resolve a junction.

A complete specification is not needed to begin. Tell us which decisions are fixed and where installation input is needed.

Project stage
Concept, technical design or work already on site?
Surfaces
A plan and the areas proposed for microcement, even approximately.
Junctions
Drains, edges, movement joints or adjoining materials to resolve.
Other trades
Who prepares the substrate, waterproofing and adjoining finishes?
Approvals
Who signs off colour direction, details and the final scope?
Send a plan or detail for assessment
Microcement colour sample book viewed inside a completed interior

Sample for a project

A sample sets a direction. It does not promise an identical pattern across the whole surface.

Ask about a sample for a specific project. Availability and terms are agreed individually.

Scale, light and hand application all affect how a larger surface is perceived.Ask about a sample

Selected VPD projects

Real surfaces, details and stages of work.

These are VPD projects. We do not attribute them to specific architecture studios.

Budget

From PLN 300/m².

Price depends on the substrate, preparation, geometry, details, area and site conditions. We prepare the final quotation after agreeing the scope.

What affects the cost?

Responsibility

Warranty up to 3 years.

The warranty period depends on the selected system and materials. The exact scope and terms are confirmed in the quotation and agreement.

FAQ

Questions before the first project.

Is VPD an architecture practice?

No. We are a surface installation contractor. We do not design complete interiors or take over authorship. We coordinate the information needed to deliver our scope correctly.

When is the best time to contact VPD?

Once the project direction is defined, but before closing details that affect the substrate, edges, wet areas, material junctions and work sequence.

Can I request a sample?

Yes. Ask about a sample for a specific project. Availability and terms are agreed individually.

How much does installation cost?

Microcement installation starts from PLN 300/m². The final quotation depends on the scope and conditions of the particular site.

How does the warranty work?

The warranty may be up to 3 years. Its period depends on the selected system and materials, with exact terms confirmed in the quotation and agreement.

Do you coordinate with other trades?

We agree sequencing and junctions where needed to deliver the VPD surface. We do not automatically take over general coordination of the whole construction project.

Initial assessment

Send the project and describe the surface.

Plans or visualisations, site photographs, location and intended timing are enough to begin. We will identify what else is needed.

Enough to get started

  • plans, visualisations or photographs
  • surfaces included in the scope
  • location and project stage
  • intended timing
You do not need to know the technical system or prepare a complete specification.
Discuss the project on WhatsApp