Floors and heating

Microcement over underfloor heating

Many microcement systems can be used over underfloor heating, but not all of them — and not on any screed at any time. It depends on the data sheet of the specific product, the condition of the screed and whether the heating has been commissioned and the screed heated up beforehand. Here is what to check before deciding.

A contractor spreading pale microcement across a surface
Application in a house near Warsaw. The photo shows a stage of the work and does not document underfloor heating.

At a glance

Check the data sheet: does the chosen system allow underfloor heating?

A heated screed must be heated up before the floor finish goes on, and the heating is switched off during application.

Screed cracks can transfer to the thin microcement layer, so they are assessed in advance.

Not every microcement

Many manufacturers allow underfloor heating: Kerakoll describes Cementoresina as suitable for heated substrates, and weber says its microcement can be used over underfloor heating. There are exceptions — Topciment excludes underfloor heating for its epoxy microcement Industtrial, and Cemher for its Microröck system. So the question is not “is microcement suitable for underfloor heating” but “is this particular system suitable”.

Heating up the screed before work starts

A heated screed should be heated up before it is covered with a floor finish. Festfloor requires the heating to be switched on and checked at the highest operating temperature. Holcim’s screed guide says the heat-up can start at the earliest 28 days after the screed is laid.

The heat-up schedule is agreed by the heating installer and the screed contractor. Topciment’s guide recommends switching the heating on at least 4 weeks before application and raising the temperature gradually. If you have a heat-up record, pass it to the microcement contractor.

Substrate moisture

Microcement goes on a dry substrate. The permitted residual moisture depends on the manufacturer and the screed type: for example, Kerakoll gives less than 1.7% for heated cement substrates, and Festfloor a maximum of 0.3% CM for heated anhydrite screeds. What counts is the limit in the data sheet of the system being used and a moisture measurement taken before application.

The heating during the work

The heating is switched off for application and then brought back gradually:

  • weber recommends switching the heating off at least 48 hours before work starts, and Topciment 48–72 hours before application;
  • Topciment recommends waiting at least 48 hours after application and raising the temperature by about 5°C a day;
  • details depend on the system — agree them with the contractor before the work date, especially in winter.

Cracks and movement joints in the screed

A heated screed moves with temperature. Ideal Work notes that shrinkage cracks in the substrate inevitably transfer to the microcement layer, and Festfloor recommends a base layer with glass-fibre mesh to limit cracks coming through from the screed. Movement joints in the screed must be kept.

Before the quote, send photos of cracks and joints and say what kind of screed it is and when it was laid.

What about heat output?

Microcement is thin, so it is often said to conduct heat well. Manufacturers stress this in their marketing, but in the data sheets of systems approved for underfloor heating we found no thermal resistance value. If that figure matters to you, ask for it for the specific product.

What this guide is based on

We use technical data sheets and guides from Kerakoll, weber, Topciment, Cemher, Festfloor and Ideal Work, and Holcim’s screed guide. They are examples of what manufacturers state. This does not mean VPD Design installs each of these systems — the specific solution is decided after assessing the floor.

VPD Design

Do you have underfloor heating?

Tell us what kind of screed it is, when it was laid and whether it has been heated up. Add photos of any cracks and joints.

Describe your floor
All guides
Send photos on WhatsApp